Here is a video installation filmed for Steel Master USA. We had two camera’s going for just about a week. It would have been quicker but we had a Hurricane come through that delayed us a bit.

Steel Master was wonderful to work with and everything went as smooth as possible for once!

Links:
Voice Over: EZvoices.net
Music: Stockmusic.net
Customers Site: SteelMasterUSA.com

More about Steel Master and this install:
Time lapse video for the construction of a SteelMaster prefabricated arch style steel building showing step-by-step footage of the steel building’s construction. A 35′ width x 18′ height x 40′ length metal storage building was selected for the application of general farm storage. The completion time for this SteelMaster building’s construction was just 3 days!

The video was filmed in Knotts Island, NC in September 2010.